| 1 |
Acceptance
within 30 days. |
| 2 |
Delivery
of equipment is included. Offloading to be arranged
by customer unless installation accepted. |
| 3 |
Proforma
payment in full prior to equipment manufacture for
contractors that do not hold an account with Teen
Recreation Limited.
(Account applications take 2 weeks, which should
be allowed for in addition to the manufacturing
lead times shown above). |
| 4 |
Installation
is subject to a minimum charge of £400. |
| 5 |
Prices
are strictly net and have been adjusted to include
a MCD of 2.5%. |
| 6 |
Prices
are subject to prevailing V.A.T. rates at time of
invoice. |
| 7 |
Comprehensive
site survey by Teen Recreation Ltd prior to order
acceptance. |
| 8 |
Hard
access required at site, minimum 3m wide. |
| 9 |
Reinstatement
of court perimeters by other. |
| 10 |
Installation
to level site, (maximum 1:80 fall), prepared by
others, assumed to be either grass or through tarmac/
concrete base to maximum 200mm thickness. Any other
type or thicker substructure may incur additional
installation costs. Reinforced concrete will incur
additional charges. |
| 11 |
Unseen
obstructions or hard digging may incur additional
installation costs. |
| 12 |
Additional
installation charges will apply if delivery cannot
be made or secure store cannot be located within
30m from working area. |
| 13 |
Floodlight
installations are also subject to terms of our approved
supplier. |
| 14 |
Identification
and redirection of existing underground services,
(electricity, water etc) by others. |
| 15 |
No
allowance has been made within this quotation for
the preparation or reinstatement of access routes
or access points. |
| 16 |
Temporary
security fencing to be provided by customer for
the duration of works. |