1 Acceptance within 30 days.
2 Delivery of equipment is included. Offloading to be arranged by customer unless installation accepted.
3 Proforma payment in full prior to equipment manufacture for contractors that do not hold an account with Teen Recreation Limited.
(Account applications take 2 weeks, which should be allowed for in addition to the manufacturing lead times shown above).
4 Installation is subject to a minimum charge of £400.
5 Prices are strictly net and have been adjusted to include a MCD of 2.5%.
6 Prices are subject to prevailing V.A.T. rates at time of invoice.
7 Comprehensive site survey by Teen Recreation Ltd prior to order acceptance.
8 Hard access required at site, minimum 3m wide.
9 Reinstatement of court perimeters by other.
10 Installation to level site, (maximum 1:80 fall), prepared by others, assumed to be either grass or through tarmac/ concrete base to maximum 200mm thickness. Any other type or thicker substructure may incur additional installation costs. Reinforced concrete will incur additional charges.
11 Unseen obstructions or hard digging may incur additional installation costs.
12 Additional installation charges will apply if delivery cannot be made or secure store cannot be located within 30m from working area.
13 Floodlight installations are also subject to terms of our approved supplier.
14 Identification and redirection of existing underground services, (electricity, water etc) by others.
15 No allowance has been made within this quotation for the preparation or reinstatement of access routes or access points.
16 Temporary security fencing to be provided by customer for the duration of works.